OIL AND VACUUM TREATMENT OF 500kV REACTORS AND TRANSFORMERS

  • Oil treatment and filling of new equipment (9 General Electric 33.33MVAr 500kV Reactors) during the pre-assembly stage at a temporary site and during final erection on the Substations bases.
  • High vacuum was applied until a pressure <1mbar was reached and maintained for 48 hours.
  • Dielectric oil treatment was carried out using thermo-vacuum until the oil standards required by the manufacturer were met (dielectric strength, humidity, particles, etc) and subsequent filling of the equipment.
  • Treatment and filling of new equipment (3 SIEMENS 500kV 100MVA Transformers) during the pre-assembly stage in a temporary site and during final erection on the Dam service bridge.
  • High vacuum was applied until a pressure <1mbar was reached and maintained for 48 hours.
  • Dielectric oil treatment was carried out using thermo-vacuum until the oil standards required by the manufacturer were met (dielectric strength, humidity, particles, etc) and subsequent filling of the equipment.

INSPECTION, DIAGNOTIC AND REPAIR OF ZTR 500kV AUTOTRANSFORMERS

DST trabajando en conjunto y mancomunadamente con las áreas de Ingeniería de Transformadores y Obras de Transmisión de UTE, llevaron a cabo la inspección completa (interna y externa), diagnóstico, dirección técnica y supervisión, desmontaje y reparación de la parte activa de un transformador de 500kV mediante el desencubado in-situ, siendo la primera reparación de estas características realizada en Uruguay.

Las tareas llevadas a cabo por el equipo de trabajo fueron:

  • Inspección, diagnóstico, desmontaje y reparación de dos autotransformadores marca ZTR 500kV 83.33MVA cada fase.
  • Inspección interna completa de las fases A y B, ensayos eléctricos y diagnóstico.
  • Complete disassembly and untanking
  • Repair of the active part (replacement of insulation damaged during the short circuit, pressing of all coils, replacement of copper plates, etc.).
  • Complete assembly and vatting.
  • Surface drying of the autotransformer insulation
  • Oil treatment and filling.
  • Testing Commissioning
  • Dirección Técnica y Supervisión
  • Confección de Informes completos de la inspección, el diagnóstico, las acciones recomendadas, los trabajos ejecutados, conclusiones y recomendaciones futuras.

ELECTROMECHANICAL ASSEMBLY, OIL AND VACUUM TREATMENT OF FOUR 500kV LINE REACTORS AND ONE 132kV NEUTRAL REACTOR

Electromechanical assembly, Vacuum, Oil Treatment, Filling and Testing

  • Assembly of reactors accessories (bushings, radiators, conservator tank, pipes, etc.).
  • Assembly and verification of reactors protections (Buchholz, thermometers, etc.).
  • Application of dry air during assembly.
  • High vacuum treatment (<1torr for 48 hours) in reactors.
  • Oil treatment in tanks by thermo-vacuum to reach the levels required by the manufacturer prior to filling (stiffness, humidity, particulate matter, etc.).
  • Oil filling of the reactors.
  • Commissioning Tests

SURVEY OF ELECTRICAL INSTALLATION AND UPDATE OF SINGLE-LINE DRAWINGS

  • Survey of power switchboards at the Pepsico Colonia production plant.
  • Verification, updating and preparation of single-line drawings.
  • Inspection and Diagnostic of the electrical installation of the power plant.
  • Relevamiento y confección de planos de PAT y PDA

INSPECTION OF THE ELECTRICAL INSTALLATION AND EXECUTION OF SINGLE-LINE DRAWINGS

  • Advice, inspection and survey of the electrical installation of the 10th floor of the WTC.
  • Execution and update of single-line drawings.
  • Testing of LV protections.

ADVISORY OF ELECTRICAL INSTALLATIONS

  • Consultancy and advisory in valuation of electrical works executed.
  • Consulting on critical contractual modifications inherent to electrical installations in buildings belonging to SUAT.
  • Diagnosis of existing installation.
  • Management of technical aspects with SUAT contractors.
  • Supervision and inspection of works executed.

SURVEY OF ELECTRICAL INSTALLATION

  • Survey of the electrical installations of the “Planta de Electrodos” and “Planta Charrua”. Plant.
  • Execution and update of electrical single-line drawings.

LIGHTING PROJECT AND SUPPLY OF LED LUMINAIRES FOR NATIONAL ROUTE 14 AND ROUTE 3

  • Lighting project for sections of Route 14 and Route 3, including bridges, roundabouts, among others.
  • Supply of more than 200 LED street lights.

SUPPLY OF NIGHT VISION EQUIPMENT

  • Supply of 50 monocular night vision equipment for night surveillance.

MAINTENANCE OF OLTC HYUNDAI/ELPROM

En ejecución durante el 2024

  • Supply of spare parts set for Service Level 1.
  • Maintenance of On-Load Tap Changer of 150kV power transformers.

SUPPLY OF HAND-HELD ONLINE MEASUREMENT OF PARTIAL DISCHARGES AND TRAINING LEVEL 1.

  • Supply of hand-held online partial discharge measurement equipment.
  • LEVEL 1 training for testing, interpretation of results and diagnostic.